<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Miami Dade Public Works Department archivos - Renovation</title>
	<atom:link href="https://fbsbldg.com/portfolio-category/miami-dade-public-works-department/feed/" rel="self" type="application/rss+xml" />
	<link>https://fbsbldg.com/portfolio-category/miami-dade-public-works-department/</link>
	<description></description>
	<lastBuildDate>Fri, 10 Dec 2021 12:52:27 +0000</lastBuildDate>
	<language>es</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://fbsbldg.com/wp-content/uploads/2021/12/favicon-100x100.png</url>
	<title>Miami Dade Public Works Department archivos - Renovation</title>
	<link>https://fbsbldg.com/portfolio-category/miami-dade-public-works-department/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Miami Dade Public Works Department</title>
		<link>https://fbsbldg.com/wp-portfolio/miami-dade-public-works-department/</link>
		
		<dc:creator><![CDATA[webmaster]]></dc:creator>
		<pubDate>Thu, 09 Dec 2021 15:23:58 +0000</pubDate>
				<guid isPermaLink="false">https://fbsbldg.com/?post_type=wpos_portfolio&#038;p=2939</guid>

					<description><![CDATA[<p>Project Description Construction: Upgrading the current drainage system, which comprised of the grassy swales to handle the storm water runoff through infiltration, to an updated system of catch basins and french drain capable of handling the 5 years of storm event, design criteria for residential roadway. The updated system brought the existing system to current [&#8230;]</p>
<p>La entrada <a href="https://fbsbldg.com/wp-portfolio/miami-dade-public-works-department/">Miami Dade Public Works Department</a> se publicó primero en <a href="https://fbsbldg.com">Renovation</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Project Description</strong><br />
Construction: Upgrading the current drainage system, which comprised of the grassy swales to handle the storm water runoff through infiltration, to an updated system of catch basins and french drain capable of handling the 5 years of storm event, design criteria for residential roadway. The updated system brought the existing system to current county standards. Work was limited to the construction and installation of drainage structures, culvert, curbing, frames &amp; grates drainage pipe 18”, 24” and 36” french drains, miscellaneous. drainage improvements, grading, sodding and roadway restoration including sidewalks and pavement installation.</p>
<p>Work Performed at:<br />
Miami Dade County<br />
SW 14th Street from SW 70th Avenue to SW 72nd Avenue<br />
SW 21st Street from SW 67th Avenue to SW 72nd Avenue<br />
SW 87th Avenue from Flagler Street to 3rd Street</p>
<p>La entrada <a href="https://fbsbldg.com/wp-portfolio/miami-dade-public-works-department/">Miami Dade Public Works Department</a> se publicó primero en <a href="https://fbsbldg.com">Renovation</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
