Miami Dade Public Works Department
Project Description
Construction: Upgrading the current drainage system, which comprised of the grassy swales to handle the storm water runoff through infiltration, to an updated system of catch basins and french drain capable of handling the 5 years of storm event, design criteria for residential roadway. The updated system brought the existing system to current county standards. Work was limited to the construction and installation of drainage structures, culvert, curbing, frames & grates drainage pipe 18”, 24” and 36” french drains, miscellaneous. drainage improvements, grading, sodding and roadway restoration including sidewalks and pavement installation.
Work Performed at:
Miami Dade County
SW 14th Street from SW 70th Avenue to SW 72nd Avenue
SW 21st Street from SW 67th Avenue to SW 72nd Avenue
SW 87th Avenue from Flagler Street to 3rd Street