Finish Project

Hyatt Dulles
Project Summary:
Room remodeling in the hotel
Drywall repair
Painting throughout the interior
Waterproofing exterior wall
Roofing repairs

Royal Palm Crown Plaza
Project Description:
Room Remodeling in the hotel
Drywall Repairs
Waterproofing exterior windows
Roofing Repairs

Miami Dade Aviation Department
Project Description:
Construction Summary:
Mechanical room concrete/slab repairs and waterproofing throughout MIA Airport Terminal
Terminal Wall Cracking and Spalding and Restorat

Joseph Caleb Daycare Center
Re-roof, Mechanical replacement, electrical & Metal standing Seam Roof.
Re-caulking and sealing of all glazing.

Protegido: Bermuda House Condominium
Structural replacement design for existing cooling tower support and repair of existing concrete beams for cooling tower

Dania Beach Casino
The Casino at Dania Beach at 301 E Dania Beach Boulevard in Dania Beach, Florida.

Miami Dade Aviation Department Heliport
Construction Summary:
Miami International Airport Heliport Restoration Project

Best Western Hotel
Construction: Complete demolition of the interior due to hurricane damage and rebuilding of the hotel.

Tides Hotel Restaurant
Construction: Demolition and remodeling entry to hotel and bar area, Demolition of interior historic bldg, remodeling and painting throughout, waterproofing windows and re-roofing.